VTC Rock Climbing Wall/Cave Project

Throughout the year we have been working on designing a wall or cave to be built at VTC. We are reaching our goal and construction on the wall or cave is anticipated for summer 2003 or sometime over the following school year.

We are hoping that we can build a bouldering cave in the basement of the Morey dorm that will span 3 walls, and the included ceiling. Our plan for an indoor wall will give greater student access, a greater time period over which the wall can be used through out the school year, and fit into an otherwise unused space.