VSC Blackboard Portal

Mechanical Engineering Technology

VTC LINC

MEC 1011

MEC 1011 - Design Communication I
Ryder’s Electronic Notebook

Return To ENotebooks

 

Assignment 1 – Part Documentation

 

Assignment 2 – Basic Features

 

Assignment 3 – Assembly Documentation

 

Assignment 4 – Advanced Features

        T with centerlines

        Ribs

        Loft

 

Assignment 5 – Special Views

 

Assignment 6 – Paperweight & Sheet Metal

 

Assignment 7 – Sculpted Forms

 

Assignment 8 – Do-nut Holder Assembly

 

Mid Term

 

1.      Jack Pin Arm

2.      Jack Slip Pin

3.      92 Inch Slide Bar

4.      88 Inch Slide Bar

5.      Typical Flap Arm (length varies)

6.      96 Flap Arm Pivot Rod

7.      Base Assembly

8.      Base Jack U Bar

9.      Typical Leg (length varies)

10. Base Front 92 Inches

11. Trailer Bar

12. Base Jack Extrusion

13. Base 147.75

14. Base Jack Pivot Arm

15. Base Jack Pivot Pin

16. Base Jack Pivot

17. Base Jack Drive Pin

18. Base Plate

19. Base Jack Assembly

20. Full Assembly

 

1.      Jack Pin Arm

2.      Jack Slip Pin

3.      Bolt

4.      92 Inch Slide Bar

5.      88 Inch Slide Bar

6.      Typical Flap Arm (length Varies)

7.      96 Flap Arm Pivot Rod

8.      Base Jack U Bar

9.      Typical Leg (length varies)

10. Base Front 92 Inches

11. Trailer Bar

12. Base Jack Extrusion

13. Base 147.75

14. Base Jack Pivot Pin

15. Base Jack Pivot

16. Base Jack Drive Pin

17. Base Plate

 

Assignment 10 - Presentations

        Base Jack Explosion

        Base Explosion

        Ramp Explosion

        Ramp Constraint Video

        Environment

 

 

Assignment 11 – Screws and Positional Tolerances

Drawings

Assemblies

 

 

Assignment 12 – AutoCad

 

Assignment 13 – AutoCad

 

Final

 

Presentation

         Base Jack Explosion

         Base Explosion

         Ramp Explosion

        Ramp Constraint Video